Production and Completion – High Pressure Flow and Gathering Pipelines

Oil and Gas Companies – Gathering Pipelines
March 27, 2018
ERW and Seamless Pipe Manufacturers
March 27, 2018

Production and Completion – High Pressure Flow and Gathering Pipelines

In the production and completion phase, time-to-market is critical to bringing revenues online. The ForceLok Mechanical Pipe Joining system allows operators to more rapidly complete gathering pipelines, significantly reducing man hours and costly x-ray and verification processes. Combined with the ForceLok Computerized Monitoring System, the ForceLok Mechanical Pipe Joining System delivers a fully repeatable, documentable connection each and every time, storing all force, pressure and penetration data that is logged and stored for each connection. This first of its kind system was designed to provide a higher level of integrity when making connections and to provide contractors and operators a higher level of quality control in the construction process.